Bearing Pressing, Injection, and Sares Line Relocation

QOS has successfully completed the relocation of the Çayırova production lines to the Manisa facility within the designated timeframe, ensuring zero losses and complete transfer.

Responsibilities of the QOS Team:

  • Dismantling, transportation, and reinstallation of production lines, including:
  • Sares Body Line
  • Facteon Drum Line
  • 3 Bearing Pressing Lines
  • 9 Plastic Injection Lines3 Outdoor
  • Raw Material Silos (100 m³ and 120 m³ capacity)

Equipment Used:

  • 300-ton mobile crane
  • 130-ton, 75-ton, and 35-ton hi-up cranes
  • 5-ton and 10-ton electric forklifts
  • 10 m makaslı personel
    yükseltici

100% Customer Satisfaction

On-Time Delivery

Expert Team

Turnkey Project