Press Line Relocation Project

QOS has successfully completed a turnkey project involving the disassembly, transportation, and installation of 400-ton presses equipped with hydraulic tie-rods, featuring 4-stage and 2-stage mechanisms, with a maximum weight of 50 tons and a height of 6.5 meters.

Responsibilities of the QOS Team:

  • Mechanical and electrical tagging and disassembly of all machinery and equipment
  • Transporting the dismantled equipment to the new installation site
  • Implementation of floor markings in accordance with the approved layout
  • Mechanical, electrical, and plumbing installations of machinery and equipment in the new facility
  • Conducting cold tests (I/O tests) on equipment for press lines
  • Turnkey commissioning of presses.

QOS Team Composition:

  • 1 Engineer
  • 30 specialized staff members were assigned to the task.

Equipment Used:

  • 3-, 5-, and 10-ton forklifts
  • 75-ton and 100-ton Hi-Up cranes
  • 6–8 m cherry picker ve 8–10 m manliftler