Bearing Pressing, Injection, and Sares Line Relocation
Bearing Pressing, Injection, and Sares Line Relocation
QOS has successfully completed the relocation of the Çayırova production lines to the Manisa facility within the designated timeframe, ensuring zero losses and complete transfer.
Responsibilities of the QOS Team:
- Dismantling, transportation, and reinstallation of production lines, including:
- Sares Body Line
- Facteon Drum Line
- 3 Bearing Pressing Lines
- 9 Plastic Injection Lines3 Outdoor
- Raw Material Silos (100 m³ and 120 m³ capacity)
Equipment Used:
- 300-ton mobile crane
- 130-ton, 75-ton, and 35-ton hi-up cranes
- 5-ton and 10-ton electric forklifts
- 10 m makaslı personel
yükseltici
100% Customer Satisfaction
On-Time Delivery
Expert Team
Turnkey Project