Door Line Installation Project

QOS has successfully completed the mechanical installation project of the door line.

Responsibilities of the QOS Team:

  • Installation of 1,470 m aluminum rail
  • Installation of 720 C-hooks
  • Installation of 10 track switches
  • Installation of 2 maintenance lifts

QOS Team Composition:

  • Personnel Lifting Platforms: 10–12 m Scissor Lift, 16 m Articulated Boom Lift
  • Forklift: 3-ton Electric Forklift