Installation of the World's Largest Tea Blending Line

QOS Engineering carried out the assembly and installation works for one of the world’s largest tea blending line installation projects.

Responsibilities of the QOS Team:

  • Unloading equipment from trucks and transporting it to the installation area (18–25 meters height)
  • Core drilling for machines and silos
  • Floor marking, alignment, and leveling of equipment within the accepted tolerances
  • Mechanical and electrical installation of machines and equipment
  • Piping works for all machines and equipment

QOS Team Composition:

  • 1 Engineer
  • 6 expert staff